Minutes of 1st Consent Committee Meeting of 2015-2016 held on 22.04.2015 at 11:00 a.m. at 4th Floor Conference Hall, MPC Board, Kalpataru Point,
Sion (E), Mumbai 22. (Booklet No. 1)
1
2
3
4
5
6
7
8
……….
The following members of the Consent Committee were present:
Dr. P. Anbalagan, IAS, Member Secretary
Chairman
Maharashtra Pollution Control Board, Mumbai
Member
Shri. R. G. Pethe
Retired WPAE, MPC Board
Member
Shri Y. B. Sontakke, Joint Director (WPC),
Maharashtra Pollution Control Board, Mumbai
Member
Shri V. M. Motghare, Joint Director (Air Pollution Control)
Maharashtra Pollution Control Board, Mumbai
Shri P. K. Mirashe, Assistant Secretary (Technical)
Member
Maharashtra Pollution Control Board, Mumbai
Sp. Invitee
Shri A. R. Supate, Principal Scientific Officer
Maharashtra Pollution Control Board, Mumbai
Sp. Invitee
Shri N. N. Gurav, Reginal Officer (HQ)
Maharashtra Pollution Control Board, Mumbai
Shri. Vasant B. Waghjale
Co-ordinater
Technical Advisor, MPCB, Mumbai
Dr. B. N. Thorat, Member could not attend the meeting. Leave of absence was granted to him.
Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of the 24th (Booklet No.
43) Consent Committee meeting of 2014-15 held on 19.03.2015 & 10.04.2015 circulated under Board’s letter No. MPCB/AS (T)/TB/B-1879 dated
17.04.2015 were confirmed.
The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
1
Sr.
No.
Name of Industry
Decision on grant Consent granted
of consent
upto
Section
Remarks/ Discussion (1)
RO(HQ)
It was decided to refer case to Environment
Department, GoM for clarification regarding Circular
dated 17.01.2014 of violation in SRA projects.
Resubmission Agenda
1
2
Reliable Construction, "Proposed SRA
Scheme", CS No. 25(pt), 55(pt), 62(pt), 68(pt)
to 72(pt) of Dharavi Division at matunga
Labour Camp Dharavi, G/North Ward, Mumbai
Sandeep Estate Development Pvt. Ltd.,
1/531, 2/532, 531(pt), At Village Dharavi Sub
Division, Sion-Bandra Link Road, Mumbai
Not Approved
Establish
Not Approved
Establish
_____
_____
RO(HQ)
Mumbai Waste Mangement Limited, MIDC
Taloja, Tal - Panvel
Approved Establish
(Part)
3
Commissioning of
the unit or 5 yrs
whichever is
earlier
RO(HQ)
It was decided to refer case to Environment
Department, GoM for clarification regarding Circular
dated 17.01.2014 of violation in SRA projects.
It was decided to grant consent to establish (Part)
for dismantling of E-waste, by imposing following
conditions:
(i) Industry should sub divide the plot, get proper
permission from MIDC and make a separate facility
of E-waste dismantling.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
4
Allied Blenders and Distilleries Pvt. Ltd.,
Plot No. 6, MIDC Chikalthana, Aurangabad
Approved Establish
(Expansion)
Commissioning of
the unit or 5 yrs
whichever is
earlier
JD(WPC)
Laxmi Board and Paper Mills Ltd., Plot No.
2, Saravali, MIDC Kalyan-Bhivandi Road, Tal Bhivandi, Dist - Thane
5
Approved Establish
(Expansion)
Commissioning of
the unit or 5 yrs
whichever is
earlier
JD(WPC)
It was decided to grant consent to establish for
expansion of production.
It was decided to grant consent to establish for
expansion for Co-generation plant 4.80 MW., by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards obtaining compliance of consent
conditions.
(ii) Consent to operate will not be granted till industry
take adequate steps to improve the quality of
treated effluent and air emissions to acheive
consented standards.
(iii) The PPM standards shall be prescribed 100
mg/nm2.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
2
6
The Dharamsi Morarji Chemical Co. Ltd.,
Plot No. 105-A, MIDC Dhatav, Tal - Roha, Dist
- Raigad
Bharat Petroleum Corporation Ltd., Wadi
Bunder Installation, Mallet Road, Wadi
Bunder, Mumbai
7
Not Approved
Establish
(Expansion)
_____
AS(T)
Approved
Operate
(Amedment)
31.08.2017
AS(T)
It was decided to issue refusal of consent to
establish as industry has already started expansion
without C to E and EC.
It was decided to grant consent to operate with
amendment for change in generation of HW
quantity, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system.
(ii) Industry shall obtain membership of CHWTSDF
with in 1 month and submit Bank Guarantee of Rs. 5
lakh towards compliance of same.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Ruby Mill Ltd., Khursundi Village, Khalapur,
Dist - Raigad
Not Approved
1st Operate
8
Appasaheb Nalawade Gadhinglaj Taluka
SSK Ltd. (Distillery), Harali, Dist - Kolhapur
9
Ninaidevi Sakhar Karkhana Ltd., (A Unit of
Dalmia Bharat Sugar & Industries Ltd.), A/p10
Krangali-Arala, Tal - Shirala, Dist - Sangli.
Not Approved
Renewal
Approved
Renewal
_____
_____
31.07.2015
JD(WPC)
JD(WPC)
JD(WPC)
Booklet No. 1 /2015-16
It was decided to keep case in abeyance and put up
in next CC after getting detail report regarding
compliance of Proposed Direction issued on
29.12.2014 for CREP non compliance.
It was decided to grant renewal of consent with
standard conditions and Bank Guarantee regime for
sugar unit.
It was decided to grant consent to renewal with
increase in C.I., by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system.
A. B. Mauri India Pvt. Ltd., Plot No. - D-7/2, A
MIDC Lote Parshuram, Tal - Khed, Dist Ratnagiri
11
JD(WPC) informed committee that C.I. of the
industry as per CA certficate submited for financial
year 2013-14 (March 2014) is 132.32 Crs. Hence
the case is in purview of CAC. It was decided to
refer case to CAC cell. CAC Cell get the detail
report from RO regarding present status of the
industry and place before next CAC meeting.
Approved
Renewal
30.11.2017
JD(WPC)
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
3
Fresh Agenda
Sahajanand Developers, CTS No. 26(PT),
Teachers Colony, MHADA Layout Siddharth
Nagar, Goregaon (W), Mumbai
Commissioning of
the unit or 5 yrs
Approved Establish
whichever is
earlier
1
RO(HQ)
It was decided to grant consent to establish for
construction of residential project on total plot area
of 8,659.44 sq. mtrs. & total construction BUA of
75,420.61 sq. mtrs., by imposing following
conditions:
(i) PP shall submit Bank Guarantee of Rs. 10 lakhs
towards compliance consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC/CRZ clearance and
C to E.
(iii) PP shall submit Board Resolution from company
Board, towards starting of construction work without
obtaining consent to establish from the MPC Board
thus violated the provisions of Environmental Laws
and in future, they will not do such violations and BG
of Rs. 2 lakh towards submission of Board
resolution by 31.05.2015.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
GGLB Estate, "Ganga Rosewood", S. No.
23/4/1, Undri, Haveli, Pune
2
Commissioning of
the unit or 5 yrs
Approved Establish
whichever is
earlier
RO(HQ)
It was decided to grant consent to establish for
construction of residential project on total plot area
of 17,500 sq. mtrs. & total construction BUA of
32,320.06 sq. mtrs., by imposing following
conditions:
(i) PP shall not take any effective steps prior to
obtaining Environment Clearance and submit Bank
Guarantee of Rs. 5 lakhs towards compliance of
same and consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
4
3
4
Premier City, "Wisdom Park", S. no. 23/1 &
24, Behind Finolex Cable, Morwadi Chowk,
Pimpri, Pune
Star City, Gat No. 336/A, Opp. Pandharpur
Crossing, Adj. to NH-4 Highway, Shirwal,
Taluka - Haveli
Not Approved
Establish
Not Approved
Establish
Trans Thane Creek Waste Management
Association, Plot No. P-128, TTC MIDC
Indusrial Area, Near L & T Infotech Ltd., Shil
Mahape Road, Mahape, Navi Mumbai
Approved Establish
5
_____
_____
Commissioning of
the unit or 5 yrs
whichever is
earlier
RO(HQ)
RO(HQ)
RO(HQ)
Industry has not obtained EC yet and Board has
already filled complaint against the PP in Hon'ble
CJM Court, Pune. Hence it was decided to return
the application and inform PP to resubmit along with
copy of the Environment Clearance.
It was decided to issue SCN for refusal of consent to
establish and stop work, for starting of construction
work without obtaining C to E and EC.
It was decided to grant consent to establish (Part)
for dismantling of E-waste, by imposing following
conditions:
(i) Industry should sub divide the plot, get proper
permission from MIDC and make a separate facility
of E-waste dismantling.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Shrinivas Pride Purple Properties Pvt. Ltd.,
"Park Express", S. no. 5, 18, 19 at Balewadi,
Dist - Pune
6
Approved Establish
(Revalidation)
Commissioning of
the unit or 5 yrs
whichever is
earlier
RO(HQ)
It was decided to grant revalidation for consent to
establish for construction of residential project on
total plot area of 57,920.25 sq. mtrs. & total
construction BUA of 1,15,546.68 sq. mtrs., by
imposing following conditions:
(i) PP shall not take any further effective steps prior
to obtaining revalidated Environment Clearance and
submit Bank Guarantee of Rs. 10 lakhs towards
compliance of same and consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
5
Sukumar Township Development Pvt. Ltd.,
"Prithvi", S. no. 45/1+2(2P)+46/134a/2,
Kondhwa Khurd, Pune
Approved
1st Operate
(Part)
7
31.01.2017
RO(HQ)
It was decided to grant consent to 1st operate (Part)
for residential on total plot area of 47,700 sq. mtrs.
& total construction BUA of 31,675.06 sq. mtrs. put
of 35,539 sq. mtrs., subject to submission of
occupancy certificate or architect certificate, by
imposing following conditions:
(i) PP shall submit Bank Guarantee of Rs. 3 lakh
towards O & M of STP and OWC.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install OWC within 3 months and
submit Bank Guarantee of Rs. 5 lakh towards
compliance of the same.
Consent draft as placed in the agenda is approved
with above conditions and corrections
8
Sumitomo Chemical India Pvt. Ltd.,
(Formerly known as M/s S.C. Agro India Pvt.
Ltd.) Plot No. T-113, 137, 138 & 251, MIDC
Tarapur, Tal. & Dist. Palghar
Approved
Operate
(Amendment)
It was decided to grant amedment in consent to
operate for increase in generation of HW quantity
from 22 MT/A to 922 MT/A
31.08.2016
AS(T)
Rama Petrochemicals Ltd., Vill. Vashivali,
Patalganga, Savroli-Kharpada Road, Tal Panvel, Dist - Raigad
9
Approved
Renewal
31.03.2016
AS(T)
Consent draft as placed in the agenda is approved
with above conditions and corrections.
It was decided to grant consent to renewal, by
imposing following conditions:
(i) Industry shall intimate 15 days in advance prior to
resuming production activity and get verified the
operation conditions of pollution control systems
from Regional Officer, Raigad.
(ii) During non-operation of the plant all liability
arising due to storage of ram amterial etc lies with
the industry including compliance of consent
conditions by extending Bank Guarantee of Rs. 1
lakh.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
6
Centaur Pharmaceuticals Pvt. Ltd., Plot no.
75 & 76, Chikhloli MIDC, Ambernath, Dist Thane
Approved
Renewal
(Amendment with
Amalgamtion)
10
Bazargaon Paper & Pulp Mills Pvt. Ltd.,
(New Boiler), Mauza-Panchnavari, Tal. & Dist 11 Nagpur
Zeus International, Plot No. A-10/11, MIDC
Tarapur, Tal - Palghar, Dist - Palghar
12
30.04.2018
AS(T)
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Not Approved
Renewal
(with increase in
C.I.)
_____
JD(WPC)
Not Approved
Renewal
(with increase in
C.I.)
_____
JD(WPC)
Approved
Renewal
Suditi Enterprises, Plot no. C-253/254, TTC
MIDC, Navi Mumbai
14
Booklet No. 1 /2015-16
Approved
Renewal
(with increase in
C.I.)
It was decided to issue SCN for refusal of consent to
renewal as JVS are exceeding prescribed
consented standard, storage of fly as is not proper
and non submission of B.G as per previous
consented standard.
It was decided to issue SCN for refusal of renewal
of consent and forfeiter of B.G. of Rs. 4 lakh out of
existing B.G. of Rs. 8 lakhs and top-up with Rs. 8
lakh to make total B.G. of Rs. 12 lakh as JVS are
exceeding prescribed consented standard.
It was decided to grant consent to renewal, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system.
Valsad District Co-op Milk Producers Union
Ltd., E-23, MIDC Tarapur, Tal - Palghar, Dist Palghar
13
It was decided to grant consent to renewal with
amendment (additions of plot no. 74) with
amalgamation, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system.
(ii) Plot area and increase C.I. to be menctioned in
conset, industry shall obtain prior C to E from Board
to cary out any activity on Plot No. 74.
30.04.2018
JD(WPC)
Consent draft as placed in the agenda is approved
with above conditions and corrections.
It was decided to grant consent to renewal with
increase in C.I., imposing standard conditions and
B.G. regime for textile unit.
31.01.2019
JD(WPC)
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
7
Balkrishna Synthetics Ltd., H-3/1, MIDC
Boisar-Tarapur, Tal- Palghar, Dist- Palghar
15
Cosma Internnational India Pvt. Ltd., Plot
No. A-12, Talegaon MIDC, Tal - Maval, Dist16 Pune
Not Approved
Renewal
_____
JD(WPC)
Not Approved
Operate
(with change in
acitivity & category)
_____
JD(APC)
Superfine Metal Pvt. Ltd., Plot No. E-29, E39, Supa MIDC Ahmednagar
Approved
Renewal
(with additional
product)
17
30.04.2016
JD(APC)
It was decided to issue SCN for refusal of consent to
renewal as JVS are exceeding consented standard
also B.G. not submitted and secondary treatment
system not provided inspite of directions issued by
the Board.
It was deccided to keep the case in abyenace and
put up in next CC after obtaing clarification from
industry regarding increase production quanity from
2,46,200 to 26,24,640 Nos./A and decrease in C.I.
It was decided to grant consent to renewal with
additional product, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system.
(ii) PP shall submit Board Resolution from company
Board, towards carrying out expansion work without
obtaining consent to establish from the MPC Board
thus violated the provisions of Environmental Laws
and in future, they will not do such violations and BG
of Rs. 2 lakh towards submission of Board
resolution by 30.04.2015.
(iii) Industry shall not exceed the consented
production quantity and submit Bank Guarantee of
Rs. 2 lakh towards compliance of same.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Cooper Corporation Pvt. Ltd., Plot No. M-60,
Additional MIDC, Satara
18
Approved
Plain Renewal
31.01.2018
JD(APC)
It was decided to grant consent to plain renewal, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system
(ii) Industry shall not exceed the consented
production quantity and submit Bank Guarantee of
Rs. 2 lakh towards compliance of same.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
8
It was decided to grant consent to renewal, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system
Automobile Corporation of Goa Ltd., Plot
No. F-2, MIDC Jejuri, Tal- Purandar. DistPune
19
Approved Renewal
30.09.2017
JD(APC)
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
9
Ambey Iron Pvt. Ltd., Plot No. E-1, MIDC
Chincholi, Tal - Mahol, Dist- Solapur
20
Approved Renewal
31.05.2016
JD(APC)
It was decided to grant consent to renewal, after
obtaining additional requisite fee, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & M of pollution control system.
(ii) Standard conditions for Sponge Iron shall be
prescribed in consent.
Consent draft as placed in the agenda is approved
with above conditions and corrections.
Review Item
1
2
3
Renewal of consent of Industries in Dhanu
Area - M/s Parekh Plastic, 12 Parekh Industrial
Estate, Collage Road, Vadkun Dahanu, Dist.
Thane, Maharashtra
Renewal of NOC for collection, reception,
storage, transportation and disposal of nonhazardous solid waste to M/s V.R. Waste
Mangment, S. No. 441, A/p - Moshi, Tal Haveli, Dist - Pune
M/s Ishwar Reality & Technology Pvt. Ltd., to
issue NOC to carry out sie remediation and
disposal of contaminated soil from the
premises of M/s Clarient Ltd., Thane to
CHWTSDF
_____
_____
_____
_____
_____
_____
RO(HQ)
RO(HQ)
RO(HQ)
It was decided to grant consent to renewal to M/s
Parekh Plastic for manufacturing of HDPE plastic
containers.
It was decided to form a committee comprasing of
Technical HOD's in order to define the policy for
such type of activity and report will be placed before
Board Meeting for approval.
As request by PP, it was decided to issue NOC to
carry out site remediation and disposal of
contaminated soil from premises of M/s Clarient Ltd,
Thane to CHWTSDF, Taloja.
Table Item
All STP's - Aurangabad, KDMC, Nagpur,
Nanded-Waghela, CIDCO Ghansoli, Sangli
Miraj Kupwad, PCMC, Mumbai, Kolhapur,
Pune & Bhiwandi-Nizampur
1
It was decided to grant consent to STP's with Bank
Guarantee regime and Standard of 30 BOD for land
lock Corporations i.e. Aurangabad, KDMC, Nagpur,
Nanded-Waghela, CIDCO Ghansoli, Sangli Miraj
Kupwad, PCMC, Kolhapur, Pune & BhiwandiNizampur. Mumbai corporation standards
accordingly to EPA and placed before Board
meeting for perusal
The meeting concluded with a vote of thanks to the Chair.
Booklet No. 1 /2015-16
Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015
10
Note:
General Points:
1. The consents shall be disposed after obtaining requisite consent fees as per GoM, revised fee structure dtd. 25.08.2011 and according to the industry wise new
validity period. The balance fees on the part of MPCB, if any, shall be considered at the time of next renewal of consent, which shall be mentioned in the consents
to be issued hereafter.
2. In case of total construction is exceeding 20,000 sq. mt. built up area, and then no effective steps shall be taken till Environmental Clearance is obtained.
3. RO(HQ) to ensure aqequacy of adequate land regurding disposal of treated effleunt in non muncipal corporation area while granting consent to 1st Operate,
necessary condition may also be imposind during grant of C to E.
4. All consent draft with respect to HCE shall be rectified for disposal of ash, disposal of sludge, APC for stacks & draft consent should be revised for combine
consent to operate & BMW authorization.
5. In case of grant of revalidated consent to establish the consent period shall be co-terminus with obtained revalidated EC or five years whichever is earlier.
Booklet No. 1 /2015-16